Intelligently connected factory: BMW Group Plant Regensburg drives digitalisation and automation of logistics with cloud-based traffic control system
Corporate
·
BMW Group Facilities
·
Production Plants
Tue Oct 29 09:00:00 CET 2024
1 Sets, 8 Photos
The new Talent Campus at BMW Group Plant Leipzig: Apprenticeships and training under one roof
Leipzig
·
BMW Group Facilities
·
Production Plants
·
Human Resources
Mon Oct 28 08:30:00 CET 2024
2 Sets, 12 Photos
BMW Group Plant Regensburg wins “Factory of the Year”
Technology
·
Corporate
·
BMW Group Facilities
·
Production, Recycling
Thu Oct 24 11:01:00 CEST 2024
1 Sets, 17 Photos
All 1066 pillars of the high-voltage battery assembly plant are in place
Straßkirchen
·
Irlbach
·
Irlbach-Straßkirchen
·
Stütze
·
Construction
·
Technology
·
BMW Group Facilities
·
Production Plants
·
Mobility of the future
·
Electrification
Tue Oct 22 15:06:51 CEST 2024
1 Sets, 7 Photos
BMW i5 Flow NOSTOKANA at Contemporary Istanbul. First display following its premiere at Frieze Los Angeles.
Corporate
·
Cultural Issues
Wed Oct 16 12:00:00 CEST 2024
1 Sets, 6 Photos
The BMW Group with two MINI world premieres and BMW Neue Klasse Vision Vehicles at the Mondial de l'Auto Paris 2024.
F56
·
J05
·
BMW Group Design
·
Technology
·
Design, Concepts, Studies
·
MINI Aceman
·
Europe
·
BMW Design
·
ConnectedDrive
·
Mobility of the future
·
Paris
·
MINI Electric
Mon Oct 14 11:25:00 CEST 2024
3 Sets, 6 Photos
BMW Group taps into markets with local production: 10 years of BMW Group Plant Araquari showcases high flexibility
Technology
·
BMW Group Facilities
·
Production Plants
·
Production, Recycling
·
Brasil
Mon Oct 07 11:16:00 CEST 2024
2 Sets, 10 Photos
Looking ahead: Year-end highlights at BMW Welt
BMW Group Facilities
·
BMW Welt
Tue Sep 24 07:00:00 CEST 2024
1 Sets, 6 Photos
BMW honors Esther Mahlangu as official partner of Frieze London 2024. Actor and Talk Art podcast co-host Russell Tovey presents his private collection in response to the artist’s work at the BMW Lounge. Frieze Music, presented by BMW, features contemporary Indie-Pop singer Arlo Parks at KOKO Club.
Corporate
·
Cultural Issues
Thu Sep 19 12:08:00 CEST 2024
5 Sets, 28 Photos
BMW Group Plant Steyr switches energy supply
Steyr
·
iFactory
·
Technology
·
Corporate
·
BMW Group Facilities
·
Production Plants
·
Sustainability
·
Production, Recycling
Wed Sep 18 13:00:00 CEST 2024
2 Sets, 16 Photos
Research Cooperation: BMW Group and University of Zagreb Optimize Battery Cell Production with Artificial Intelligence
Battery Cell Competence Centre
·
battery cell
·
High-voltage battery
·
Technology
·
Society
·
Sustainability
·
Mobility of the future
·
Production, Recycling
·
Electrification
Thu Sep 12 09:00:00 CEST 2024
1 Sets, 13 Photos
BMW Group Recycling and Dismantling Centre (RDC): 30 years of setting the pace for the circular economy.
Corporate
·
Sustainability
Mon Sep 09 09:00:00 CEST 2024
1 Sets, 17 Photos
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Michael Scheuchl, Leiter Immobilienbereitstellung, Moritz Kippenberger, Leiter BMW Group Aus- und Weiterbildung, Petra Peterhänsel, Leiterin BMW Group Werk Leipzig, und Jens Köhler, Betriebsratsvorsitzender BMW Group Werk Leipzig. (10/2024)
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Moritz Kippenberger, Leiter BMW Group Aus- und Weiterbildung, Petra Peterhänsel, Leiterin BMW Group Werk Leipzig, Jens Köhler, Betriebsratsvorsitzender BMW Group Werk Leipzig, und Michael Scheuchl, Leiter Immobilienbereitstellung. (10/2024)
Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together digitally, thus reducing construction time and helping to collaborate on critical interfaces at an early stage. (10/2024)
In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire department, as planned in summer. (10/2024)
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are being installed and the first technical building equipment is being installed. (10/2024)
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Michael Scheuchl, Leiter Immobilienbereitstellung, Moritz Kippenberger, Leiter BMW ...
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Michael Scheuchl, Leiter Immobilienbereitstellung, Moritz Kippenberger, Leiter BMW Group Aus- und Weiterbildung, Petra Peterhänsel, Leiterin BMW Group Werk Leipzig, und Jens Köhler, Betriebsratsvorsitzender BMW Group Werk Leipzig. (10/2024)
Related Articles.
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Moritz Kippenberger, Leiter BMW Group Aus- und Weiterbildung, Petra Peterhänsel, ...
Eröffnung des Talent Campus im BMW Group Werk Leipzig: (v.l.n.r.) Moritz Kippenberger, Leiter BMW Group Aus- und Weiterbildung, Petra Peterhänsel, Leiterin BMW Group Werk Leipzig, Jens Köhler, Betriebsratsvorsitzender BMW Group Werk Leipzig, und Michael Scheuchl, Leiter Immobilienbereitstellung. (10/2024)
Related Articles.
Eröffnung des Talent Campus im BMW Group Werk Leipzig (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
Related Articles.
Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together ...
Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together digitally, thus reducing construction time and helping to collaborate on critical interfaces at an early stage. (10/2024)
Related Articles.
In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire ...
In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire department, as planned in summer. (10/2024)
Related Articles.
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are ...
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are being installed and the first technical building equipment is being installed. (10/2024)
Related Articles.
The concrete pillar, which weighs around nine tons, is transported by a crawler crane to the intended location on the construction site. (10/2024)