Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Global · Article.

All 1066 pillars of the high-voltage battery assembly plant are in place

+++ Construction of the new assembly plant for high-voltage batteries in Lower Bavaria is progressing rapidly +++ The last concrete pillar has been erected just over half a year after the building permit was approved +++ The structure of the production building will be completed at the end of the year +++

Straßkirchen
·
Irlbach
·
Irlbach-Straßkirchen
·
Stütze
·
Construction
·
Technology
·
BMW Group Facilities
·
Production Plants
·
Mobility of the future
·
Electrification
 

Press Contact.

Oliver Gschwandtner
BMW Group

Tel: +49-151-601-20033

send an e-mail

Author.

Sarah Koehler
BMW Group

Downloads.

  
Attachments(1x, 615.32 KB)
  
Photos(7x, 28.52 MB)

This article in other PressClubs

Irlbach-Strasskirchen. The 1066th and thus the last pillar of the BMW Group's new assembly plant for high-voltage batteries is in place. Just 16 weeks, around 100 working days after the official start of construction at the end of June, a mobile construction crane brought the final concrete pillar of the central production building vertically. Overall, the assembly plant is clearly taking shape: prefabricated elements for fire-, interior- and outer-walls as well as stairwells have already been installed, concrete ceilings, roof structures including roof sheets and seals have already been built in. The concreting of the hall floor has begun in the already covered areas. Preparatory work has been carried out for the installation of the first façade elements. Despite difficult weather conditions in recent weeks, construction progress has thus been achieved according to plan.

Alexander Kiy, overall Project Manager Plant Construction in Irlbach-Strasskirchen: “We received construction permission for our new assembly plant just six months ago. In cooperation with the authorities, we were able to successfully complete one of Germany's fastest building permit processes in April 2024. In less than half a year, all pillars are now in place. The structure of the central production building is clearly visible.”

In the future, the sixth-generation high-voltage batteries for the Neue Klasse will be manufactured in the approximately 150,000 square meter building. The assembly site in Lower Bavaria is making a significant contribution to the expansion of e-mobility and will supply the Munich, Regensburg and Dingolfing vehicle plants with the latest, sixth generation of high-voltage batteries. The BMW Group is thus securing employment at its Bavarian plants and further expanding the pioneering role of e-mobility in Germany. When completed, around 1,600 people will initially be employed at this production site.

The Irlbach-Strasskirchen site is one of a total of five assembly plants worldwide for the new generation of high-voltage batteries.

 

Digital construction planning and cross-functional collaboration

Silvia Meyer, Head of High-Voltage Battery Real Estate Management in Lower Bavaria: “Cooperation across locations helps us a lot to implement the five similar construction projects worldwide at high speed. We benefit from the experience of projects with different degrees of progress. Beside us, our colleagues, who plan the assembly process and logistics, are already using digital production planning. It helps all of us. We identify interfaces at an early stage and discuss solutions in virtual space and can counteract potential collisions at an early stage.” In concrete terms, all processes, including transitions between the assembly stages, are simulated. For example, it is necessary to coordinate the space required for interim storage, which is necessary for the timely provision of the required parts at the respective location. The way in which these parts are delivered must be considered, as well as technical connections and free space for plant maintenance work.

 

Site operation functions located in side-buildings

As planned, construction of the side-buildings began in summer 2024. Construction work has begun for the company catering, the non-series material warehouse and the disposal center. The so-called terraced house houses the energy center, service center and the factory fire department.

The structure, including roof work, of the central production building is to be completed by the end of 2024. In 2025, the interior construction will be continued and the production systems for assembling the high-voltage batteries are being installed. After trial operation, series assembly will start in 2026.

 

Further information about the new location in Irlbach-Strasskirchen can be found on the project website — at www.bmwgroup-werke.com/irlbach-strasskirchen. The next opening dates for the information container on the construction site: October 25, November 15 and December 13 from 3 pm to 5 pm.

Article Offline Attachments.

Article Media Material.

My.PressClub Login

PressClub Information

RSS NEWS FEED.

Open Website

With the PressClub RSS service, you can also receive publications as a news feed. Choose from various topic-specific feeds as needed, or use the feed with the latest articles to stay up to date.

CO2 emission information.

Fuel consumption, CO2 emission figures and power consumption and range were measured using the methods required according to Regulation VO (EC) 2007/715 as amended. They refer to vehicles on the German automotive market. For ranges, the NEDC figures take into account differences in the selected wheel and tyre size, while the WLTP figures take into account the effects of any optional equipment.

All figures have already been calculated based on the new WLTP test cycle. NEDC figures listed have been adjusted to the NEDC measurement method where applicable. WLTP values are used as a basis for the assessment of taxes and other vehicle-related duties which are (also) based on CO2 emissions and, where applicable, for the purposes of vehicle-specific subsidies. Further information are available at www.bmw.de/wltp and at www.dat.de/co2/.

Latest Facts & Figures.

Specifications of the BMW 1 Series 116, valid from 11/2024.
Tue Oct 29 15:21:59 CET 2024
1 Series
Specifications of the BMW 5 Series Sedan, valid from 07/2024.
Fri Jun 28 09:53:00 CEST 2024
G60
5 Series
Specifications of the BMW 5 Series Touring, valid from 07/2024.
Fri Jun 28 09:50:00 CEST 2024
G61
Touring
Show all

Search Settings.

Press Release
Press Kit
Speech
Fact & Figures
Spanish
  • Language of Attachment
  • Arabic
  • Chinese - simplified
  • Chinese - traditional
  • English
  • English - US
  • French
  • German
  • Hungarian
  • Italian
  • Japanese
  • Korean
  • Multilingual
  • Russian
  • Spanish
Updates
Top-Topic
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login