Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Article.

L'usine BMW Group à Steyr en Autriche change de source d'énergie

+++ Électricité plus durable et chauffage urbain à partir de copeaux de bois produits localement +++ Annoncé pour 2025, introduit plus tôt que prévu en septembre 2024 +++ Arnold Schwarzenegger et le membre du conseil d'administration de BMW chargé de la production procèdent à un changement énergétique symbolique +++

Steyr
·
iFactory
·
Technologie
·
Corporate
·
Usines, installations
·
Usines de production
·
Développement durable
·
Production, recyclage
 

Press Contact.

Jeroen Lissens
BMW Group

Tel: +32-3-890-9708

send an e-mail

Author.

Martina Hatzel
BMW Group

Downloads.

  
Attachments(1x, 545,73 KB)
  
Photos(6x, 32,65 MB)

Other Languages.

Related Links.

+++ Électricité plus durable et chauffage urbain à partir de copeaux de bois produits localement +++ Annoncé pour 2025, introduit plus tôt que prévu en septembre 2024 +++ Arnold Schwarzenegger et le membre du conseil d'administration de BMW chargé de la production procèdent à un changement énergétique symbolique +++ 

Steyr. BMW Group Plant Steyr is switching entirely to district heating for warmth: in regular operations the Austrian engine facility now no longer uses natural gas, relying instead on heat from a nearby biomass powerplant. In a symbolic act, Milan Nedeljković, Board Member for Production at BMW AG, and Arnold Schwarzenegger turned on the new power supply. The change of energy source marks yet another step in the BMW Group’s efforts to reduce its carbon footprint.

Milan Nedeljković, member of the Board of Management of BMW AG responsible for Production: “We are optimising the carbon footprint of all our production facilities worldwide, using innovative technologies and the potential of the local area to generate energy from fossil fuel-free sources. Today, we are setting a new milestone here in Steyr.”

Consistent reductions in energy consumption

BMW Group Plant Steyr uses around 250 gigawatt hours of energy a year – enough to power about 59,000 homes. Over the last few years, energy consumption has fallen steadily: “Since 2006 we have succeeded in almost halving the amount of energy we use per engine,” explained Plant Director Klaus von Moltke.

Heat supplies play a particularly important role in all of this: “The plant was first connected to the district heating grid in 2012. Since then, there have been multiple expansions,” Klaus von Moltke continued. The transition to purely district heating was expected to reach completion at the turn of the year 2024-2025 but has now been realised two and a half months earlier.

Where the heat comes from: regional district heating from wood chips

The switch would not have been possible without a strong partner in the region: BMW Group Plant Steyr now sources its heat from the biomass powerplant of Fernwärme Steyr, just under a kilometre away. This is operated by the state’s two energy providers – Energie AG Oberösterreich Erzeugung GmbH and EVN Wärme GmbH – in their joint subsidiary, Bioenergie Steyr GmbH. To provide the heat energy that Plant Steyr needs, an additional heat generation plant with a 10-megawatt biomass boiler is being erected at the site. So, Plant Steyr will source its heat from renewable resources: wood chips from the surrounding forests.

Klaus von Moltke summarised the situation saying: “By switching to 100 percent heat from regenerative biomass, we are taking a major step today. Our plant now sources both its electricity and its heat for regular operations from renewables.”

Today’s symbolic energy switch took place on stage as more than a thousand employees looked on. In his keynote speech Arnold Schwarzenegger called on everyone present to act on climate change. He then shut down the plant’s gas supply. Milan Nedeljković, Board Member for Production at BMW AG, then symbolically turned on the final expansion to the district heating supply.

Arnold Schwarzenegger then joined Klaus von Moltke and Milan Nedeljcović for a tour of the training and education centre, engine assembly and BMW Group Plant Steyr’s recently opened electric motor production line, chatting with employees as he went.

 

Article Offline Attachments.

Article Media Material.

My.PressClub Login

PressClub Information

RSS NEWS FEED.

Open Website

With the PressClub RSS service, you can also receive publications as a news feed. Choose from various topic-specific feeds as needed, or use the feed with the latest articles to stay up to date.

Search Settings.

Communiqué de presse
Dossier de presse
Discours
Fact & Figures
Néerlandais
  • Langue du fichier en pièce jointe
  • Allemand
  • Anglais
  • Anglais
  • Espagnol
  • Français
  • Néerlandais
Updates
Top-Topic
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login