Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Slovenia · Article.

Vse pod eno streho – zaposleni se selijo v komunikacijski center BMW Group tovarne v Debrecenu.

+++ Hans-Peter Kemser, direktor tovarne v Debrecenu: "Še en mejnik na poti do Neue Klasse" +++ Obkrožen z vsemi proizvodnimi tehnologijami: komunikacijski center kot osrednja točka komuniciranja +++ V Debrecenu že več kot 1.000 zaposlenih +++

Tehnologija
·
Tovarne, objekti
·
Proizvodne lokacije
·
Proizvodnja in predelava vozil

Press Contact.

Maja Ilec
BMW Group

Tel: +38615867374

send an e-mail

Author.

Maja Ilec
BMW Group

Related Links.

Dodatne informacije so na voljo spodaj in v priponki v angleščini.  
 

+++ Debrecen Plant Director Hans-Peter Kemser: “Another milestone on the road to the NEUE KLASSE” +++ Surrounded by all production technologies: Communication Centre as central hub +++ Already more than 1,000 employees in Debrecen +++

 

Debrecen. Employees of the future Plant Debrecen have moved into the central Communication Centre, where they are joining forces for the final stretch before the official series launch of the NEUE KLASSE. Debrecen Plant Director Hans-Peter Kemser is pleased with construction progress: “In just a few months, pre-series production will get underway here in Debrecen, setting new standards – not just for the vehicles themselves, but also for processes here at the plant. The Communication Centre will support us by creating short lines of communication and enabling a good exchange of information between all technologies at any time.” The architecture also supports the concept of the BMW iFACTORY, which will be fully implemented in Debrecen.

 

While non-production employees are already settling into their workplaces on-site, production staff are preparing for their future roles at Plant Debrecen within the company’s global production network. This will ensure a smooth start to pre-series production in 2024 and the successful series launch of the first NEUE KLASSE model in 2025.

 

Model of Leipzig central building further optimised

Inspired by the central building at BMW Group Plant Leipzig, the Communication Centre in Debrecen will also link the production technologies of the body shop, paint shop and assembly. In Debrecen, this underlying principle was further developed with the creation of a central building where the network idea is paramount. The open architecture provides both meeting spaces and sequestered workplaces. The two-storey Communication Centre is about 19,000 square metres in size; around half of this area will be office space.

 

The three main production areas are situated around the administrative area. The Communication Centre is not just where colleagues come together, but also people and products: From the body shop, which is adjacent to the office building on the right, unpainted car bodies will make their way on a conveyor belt, visible above people's heads, through the Communication Centre to the paint shop, located centrally behind it. From there, the painted bodies will be transported back through the office building to the vehicle assembly, which is to the left. This means that everyone who does not work directly in production can still see the product at all times.

 

The multifunctional staff restaurant can also be used for meetings outside of mealtimes. This is located on the ground floor as well, along with the central marketplace and health centre. A state-of-the-art laboratory also found home in the Communication Center's ground floor area in 1,300 square meters. The colleagues of the laboratory will be responsible for the premium quality of the colors of the Neue Klasse models. The 700-square meter, well-equipped Health Center of the Plant will be operating in the building as well to take care of the colleagues' health and well-being, while also carrying out prevention and screening campaigns. The upper floor is occupied by offices.

 

Architectural concept based on principles of BMW iFACTORY

Digitalisation is playing a major role in construction of the plant – the virtual start of production for Plant Debrecen's digital twin already took place in March 2023. The importance of digitalisation is also reflected in the Communication Centre’s equipment. Meeting rooms feature modern digital elements that enable virtual collaboration throughout the plant and beyond.

 

The principles of the BMW iFACTORY were already taken into consideration during the planning phase. 5G technology is used throughout the grounds and paper is rarely seen at the Debrecen plant – which aims to be virtually paperless.

Other resources will be used carefully as well. When choosing the furniture, easy-to-recycle materials were preferred, with extensive use of wood. Plant Debrecen will also operate entirely without fossil fuels.

Article Offline Attachments.

Article Media Material.

My.PressClub Prijava

PressClub Information

RSS NEWS FEED.

Open Website

With the PressClub RSS service, you can also receive publications as a news feed. Choose from various topic-specific feeds as needed, or use the feed with the latest articles to stay up to date.

CO2 emission information.

Prikazane vrednosti porabe goriva, emisij CO2 in energijske učinkovitosti, so bile določene v skladu z Uredbo (ES) št. 715/2007 v različici, ki je veljala v času odobritve. Vrednosti se nanašajo na vozilo z osnovno konfiguracijo v Nemčiji. Prikazan doseg vozila upošteva opcijsko opremo ter različne velikosti platišč in pnevmatik, ki so na voljo za izbrani model ter se lahko spreminja glede na različne konfiguracije vozila.

Prikazane vrednosti za vozila že temeljijo na novem postopku preverjanja WLTP in so pretvorjene tudi v vrednosti, ki so primerljive z NEDC, da je zagotovljena primerjava med vozili. V zvezi s temi vozili se lahko tukaj prikazane vrednosti emisij CO2 razlikujejo od vrednosti, ki se (med drugim) upoštevajo za določitev ustreznih davkov ali drugih dajatev povezanih z emisijami CO2.

Nadaljnje informacije o uradnih podatkih varčnosti porabe goriva, specifičnih emisijah CO2 in ostali podatki o energijski učinkovitosti novega osebnega avtomobila so na voljo v »Priročniku o varčnosti porabe goriva, emisijah CO(2)«, ki je na voljo na vseh prodajnih mestih in na www.bmw.si/emisije ter www.mini.si/emisije.

Latest Facts & Figures.

Cenik vozil BMW- november 2024.
Fri Nov 01 08:00:00 CET 2024
Korporativne finance, podatki in številke
Cenik vozil MINI - november 2024.
Fri Nov 01 08:00:00 CET 2024
Korporativne finance, podatki in številke
Cenik vozil MINI - julij 2024.
Fri Jul 05 09:36:00 CEST 2024
Korporativne finance, podatki in številke
Cenik vozil BMW - julij 2024.
Fri Jul 05 09:33:43 CEST 2024
Korporativne finance, podatki in številke
Cenik vozil MINI - marec 2024.
Fri Mar 01 08:25:00 CET 2024
Korporativne finance, podatki in številke
Show all

Search Settings.

Sporočilo za javnost
Gradivo za medije
Govor
Fact & Figures
Vietnamese
  • Jezik datoteke v prilogi
  • Arabic
  • Chinese - simplified
  • English
  • French
  • German
  • Hindi
  • Indonesian
  • Italian
  • Japanese
  • Korean
  • Slovakia
  • Slovenian
  • Spanish
  • Tamil
  • Thai
  • Vietnamese
Updates
Top-Topic
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Prijava